China Sourcing Agents
Get a Quote

SMT Assembly Sourcing & Quality from China

4 resources tagged with "Smt"

SMT (surface-mount technology) is the core of PCB assembly in China — solder paste printing, pick-and-place, reflow, and inspection — and each stage has a defect mode you should know before auditing a line. IPC-A-610 defines the acceptance criteria, with Class 2 the default for consumer and commercial electronics and Class 3 reserved for high-reliability work; the difference shows up in things like allowed BGA void percentage and solder fillet requirements. The mistake buyers make is not specifying the IPC class in the PO, then disputing solder-joint quality against a standard the factory never agreed to build to.

SMT is the automated process that places and solders surface-mount components onto a PCB. When sourcing it from China, we specify the IPC-A-610 class up front, verify stencil and DFM rules, and inspect the reflow and AOI stages, since most field failures trace back to a paste or placement defect that proper inspection catches.

Guides (1)

Wiki (3)

FAQ

What IPC-A-610 class should I specify for SMT assembly?

Class 2 is the standard for most consumer and commercial electronics. Class 3 (high-reliability, e.g. medical, aerospace) has stricter limits on voids and solder fillets and costs more. State the class in the PO — otherwise you have no agreed acceptance criteria.

What are the main stages of SMT assembly to inspect?

Solder paste printing, pick-and-place, reflow soldering, and inspection (AOI and often X-ray for BGAs). Most defects originate at paste printing and placement, so those plus AOI/X-ray coverage are what to check during a factory audit.

What's the most common SMT defect from low-cost factories?

Solder issues — bridging, insufficient solder, tombstoning, and BGA voids beyond IPC limits — usually from poor paste printing or an uncontrolled reflow profile. Specifying IPC-A-610 Class 2 and requiring AOI/X-ray data catches most of them.

Related Topics

Engineer-led sourcing No hidden margins 24-hour response

Have a sourcing project in mind?

Tell us what you need. We respond within 24 hours, including weekends.